You can define (e.g., “Strike at port” with 15% probability) and attach them to activities. Pertmaster does not just vary durations; it triggers discrete events. If the random number generator lands on 0.15, the activity duration multiplies by 1.5 and a resource cost is added.
After a Monte Carlo run, a deterministic scheduler might say, “The project is risky.” A Pertmaster analyst points to the and says: “If we reduce uncertainty in Activity X by 50%, we gain 18 days of schedule confidence.” The Risk Driver Matrix Pertmaster identifies which activities or paths drive the overall uncertainty. Often, these are not on the deterministic critical path. A near-critical path with high variance (e.g., permitting, regulatory approval) can become the stochastic critical path in 40% of simulations.
If you are a planner who only uses P6, you are playing chess with only pawns. Adding Pertmaster gives you queens, knights, and bishops—the ability to see probability distributions, risk drivers, and the true shape of uncertainty.
Introduction: The Illusion of Certainty For decades, project controls professionals have worshipped at the altar of the Critical Path Method (CPM). Primavera P6 is the undisputed king of deterministic scheduling. It tells you: “Activity A takes 10 days. Activity B takes 5 days. The project finishes on June 1st.”